US SMB founders planning a first SaaS release usually overbuild. The backlog fills with multi-tenant edge cases, dashboards nobody asked for, and a mobile app that delays the only thing that matters: proving the core workflow with real users.
This post is for US small and midsize businesses that need a shippable first SaaS slice — features, a rough timeline, and a Softix-oriented starter budget — before they write a huge statement of work. Softix publishes a free SaaS MVP Scope & Cost Estimator for that job. It is an educational starter range for Softix-style delivery, not accounting advice, and not a fixed Softix SOW.
Run the live estimator: Softix SaaS MVP Scope & Cost Estimator. No email gate.
Who this estimator is for
Use it if you are a US founder or product owner deciding what belongs in a SaaS MVP versus what to skip. Typical situations:
- You have a paid problem and a workflow, but the feature list looks like a Series B product.
- An agency quoted a “full platform” and you need a smaller first-release frame.
- You are not sure whether to build at all — Softix’s published role includes telling you to buy SaaS instead when that is the honest answer.
If you are still exploring whether custom software is the right category, pair this estimator with Softix’s Build vs Buy calculator. This page is specifically about sizing a first SaaS release once you have chosen to build.
When to use it
Open the estimator when you can name the core workflow in one sentence and you need to translate that into modules, roles, integrations, and a planning budget. Do not open it hoping the default dollars are your quote. Softix scopes a real MVP after discovery.
Good timing:
- Before you hire a full product squad for v1.
- Before you promise a mobile app in the same release as auth, billing, and the core loop.
- Before you treat “admin dashboard” as a must-ship item nobody has requested.
Softix’s MVP approach
The tool page splits the work into three ideas that match how Softix talks about first releases for US SMBs (Lahore delivery):
- Must-ship — auth, core workflow, billing stub, admin: only what proves the business.
- Skip for v1 — nice-to-haves, multi-tenant edge cases, and dashboards nobody asked for yet.
- Softix role — scope a shippable first release, or tell you to buy SaaS instead.
That last point matters. An estimator that always recommends a build is a sales widget. Softix’s public framing is that Buy can be the right outcome. Use the numbers to see whether a first release is even in a range you can fund; then pressure-test the scope, not just the dollars.
Fields on the live tool (starter defaults)
The estimator ships with low Softix-oriented starter defaults. Change them. Published defaults include:
- Expected launch users: 50
- Core modules (workflows): 3
- User roles: 2
- Integrations (Stripe, email, CRM…): 2
- Mobile app in v1: optional toggle
- Softix base MVP build: $8,000
- Extra $ per module: $1,500
- Extra $ per integration: $800
- Softix weeks per module (pace): 2
Read those as planning knobs, not a menu. A “module” here is a workflow, not a random settings screen. An integration is something like Stripe, email, or a CRM — real connections that take design and test time. The two-week-per-module pace is a Softix-oriented starter, not a guarantee.
How to interpret the output
The estimator combines base build, extra modules, extra integrations, and pace into a starter budget and a rough timeline. Interpret it this way:
- Start from must-ship, then add. If you cannot explain why a module proves the business, set core modules down, not up.
- Roles are complexity, not vanity. Two roles (for example owner and staff) is a different product from five permission matrices. The default of 2 is a hint to stay small.
- Integrations are not free. Each extra connection is $800 in the starter model. If you listed eight “just in case” APIs, you are no longer estimating an MVP.
- Mobile in v1 is a scope bomb. Use the toggle only if the workflow truly cannot be proven in a browser. Softix’s must-ship list does not assume a native app.
- Launch users of 50 is a planning default. It is not a traffic forecast. Raise it only if it changes architecture you actually need in v1 — most SMBs should not.
If the resulting range still looks like a platform, you over-scoped. Cut modules until the first release is boring and shippable.
A working session you can copy
Sit down with whoever will use the product on day one:
- Write the core workflow on a whiteboard in five steps. That is module one.
- Add at most two more workflows that must exist for those five steps to be real. Stop.
- List integrations that would block a paid pilot if missing. Cap at two unless you have a hard reason.
- Leave mobile off unless the job is done in the field with no laptop.
- Run the estimator. Treat $8,000 base + $1,500 per extra module + $800 per extra integration as a Softix-oriented sketch you will replace in discovery.
Then open Softix’s related SaaS MVP checklist if you want a punch-list alongside the numbers. The estimator sizes; the checklist keeps you honest about skip-for-v1 items.
What “not a fixed SOW” means in practice
Discovery can move the number up because your billing is not a stub, your roles are messy, or an integration is actually an ERP. Discovery can also move you to Buy. Either outcome is a successful use of the tool. The failure mode is treating the live page as a price list and then being surprised when a real scope looks different.
Softix can scope a real MVP after discovery. The estimator exists so that conversation is about what to ship, not about whether a first release is imaginable.
Next step
Cut the backlog to must-ship, enter your modules and integrations, and see whether v1 still looks like a product you can launch.
Launch the Softix SaaS MVP Scope & Cost Estimator →